News Flash Home
The original item was published from 10/4/2019 2:25:20 PM to 11/2/2019 12:00:01 AM.

News Flash

Trending News

Posted on: October 4, 2019

[ARCHIVED] Sidewalk Cutting Program to Begin Monday, Oct. 4

sidewalk cutting (JPG)

On Monday, October 7th, the village’s contractor Hard Rock Concrete Cutters, Inc. will be in the Village cutting and slicing trip hazards in zones 3 & 4 on the map. This process costs less than removing the entire sidewalk square, and saves the village significant cost to improve sidewalk infrastructure. Each machine is equipped with water for dust suppression. After the cut is complete there is a small amount of concrete slurry that is washed away and diluted. This process is not harmful to vegetation. The process will be no longer than 20 minutes per cut and residents will have full access to their driveways. 



Facebook Twitter Email

Other News in Trending News

cold weather safety tips website

Limit Time Outdoors During Severe Cold

Posted on: January 31, 2023
Carbon Monoxide Alarm with teal background

Prevent Carbon Monoxide Poisoning

Posted on: January 25, 2023
smart phone in hand dialing 911

Sign Up for Smart 911

Posted on: January 23, 2023
purple background with white text about road closure

W. Wilson Ave Road Closure

Posted on: January 23, 2023
Flashing Crosswalk Sign and blue sky

Flashing Crosswalk Signs at Main St Down

Posted on: January 13, 2023
9M Routine - General  (395 x 305 px)

Prevent Thefts With the 9 p.m. Routine

Posted on: January 3, 2023
Cars parked in snow with text

Winter Parking Reminders

Posted on: December 12, 2022
Prevent freezing pipes (395 x 305 px)

Prevent Freezing Pipes

Posted on: December 20, 2022