News Flash Home
The original item was published from 7/10/2020 2:52:00 PM to 8/6/2020 10:57:49 AM.

News Flash

Trending News

Posted on: July 2, 2020

[ARCHIVED] Main Street Construction News and Updates from Public Works

road construction ahead

Main Street Construction: Week of July 13 

  • Final asphalt paving work is scheduled to begin Monday, July 13th, and continue through the week. Paving will begin at St. Charles Road and continue to Graham Avenue, and slow-moving construction equipment will work within closed lanes. One travel lane in each direction will remain open throughout the paving process. Landscaping and sidewalk corner work will also continue, and access to side streets and driveways will be maintained.

    main street construction
  • Beginning the week of July 13th, work on Main Street from Wilson Avenue to Roosevelt Road will begin. The project will include surface removal and resurfacing, drainage adjustments, curb improvements as needed, and sidewalk work. Due to intermittent lane closures that will be required throughout the project, traffic impacts are expected to impact the Main Street and Roosevelt Road intersection. Sign boards will be in place ahead of the project, in order to notify motorists of the upcoming construction.

main street asphalt

The Village understands that construction impacts traffic and we apologize for any inconvenience that motorists have experienced due to the construction activity. This temporary inconvenience allows the Village to improve roadways, update infrastructure, and invest into the Lombard community for years to come. For more information on the project, please visit villageoflombard.org/main. Anyone wishing to receive more updates about the Main Street Improvement project may sign up for email notifications for the 2020 Main Street Improvements email list at villageoflombard.org/notifyme.

Parking Lot Asphalt Paving 

  • Parking lots at 115 W. St. Charles Rd. and 25 W. Maple Street (Historical Society, library staff, and commuter parking) will also be resurfaced in September (postponed from mid-July). The parking lots will be inaccessible during the construction. To receive email notifications about the Village’s Asphalt Paving and Patching, sign up at villageoflombard.org/notifyme.
  • Additional asphalt roadways will be as part of the Village’s annual pavement maintenance program. The Village’s Interactive Construction Map can be found at villageoflombard.org/constructionmap.  

Sanitary Sewer Investigation and Smoke Testing 

The Village of Lombard is conducting a smoke testing program to locate sources of water that enter the sanitary sewer system during rainstorms. This water can overload sanitary sewers and cause sewage backups in basements and other low-lying areas. The testing is scheduled for the week of July 20th, weather permitting. During testing, non-toxic, non-flammable and low scene liquid smoke is pressurized through the system. The smoke will rise from manholes, vent stacks on homes, and the ground where sewers may have leaks. The smoke will identify areas of the system that may require service. Affected residents will receive a door hanger with more information before smoke testing begins. Visit www.villageoflombard.org/sanitarysewerinvestigation for more information.

Connect with Public Works for Updates and More Information 

For additional information about Public Works projects, visit villageoflombard.org/construction. To view an interactive map of Public Works projects, visit villageoflombard.org/constructionmap. For alerts and emergency notifications, connect with the Village of Lombard on Facebook and Twitter. If you do not have social media, the Village’s social feeds are available for viewing at www.villageoflombard.org.

Facebook Twitter Email

Other News in Trending News

cold weather safety tips website

Limit Time Outdoors During Severe Cold

Posted on: January 31, 2023
Carbon Monoxide Alarm with teal background

Prevent Carbon Monoxide Poisoning

Posted on: January 25, 2023
smart phone in hand dialing 911

Sign Up for Smart 911

Posted on: January 23, 2023
purple background with white text about road closure

W. Wilson Ave Road Closure

Posted on: January 23, 2023
Flashing Crosswalk Sign and blue sky

Flashing Crosswalk Signs at Main St Down

Posted on: January 13, 2023
9M Routine - General  (395 x 305 px)

Prevent Thefts With the 9 p.m. Routine

Posted on: January 3, 2023
Cars parked in snow with text

Winter Parking Reminders

Posted on: December 12, 2022
Prevent freezing pipes (395 x 305 px)

Prevent Freezing Pipes

Posted on: December 20, 2022