Roosevelt Road (IL Rt. 38)/Finley Road Intersection Improvements

General Information


Tentative Start Date: April 2017
Tentative Completion Date: September 2017
Project Manager: Matthew Lew
Contractor: TBD
Awarded Contract Amount: TBD
Funding Sources: Construction Fund

Contact Information


Public Works Department
Phone: (630) 620-5740
Email: publicworks@villageoflombard.org 

Resident Engineer: George Malik
Field Office Phone Number: TBD

Project Manager: Matthew Lew
Email: lewm@villageoflombard.org
Phone: (630) 620-5740

After Hours: Lombard Police Department
(630) 873-4400

Communications

 
Public Meeting: TBD

Notify Me: Residents within construction areas are encouraged to sign up for Notify Me to receive timely updates regarding construction in their area. Click here to sign up.

Newsletters & Notices: Periodically newsletters and notices are distributed to residents to keep them apprised of current and upcoming construction related events. 

Project Information

 
This Project Includes: The improvements include curb and gutter removal, sidewalk removal, new drainage structures with connections to the existing storm sewer system, new curb and gutter, PCC pavement widening, new concrete sidewalk, moving existing light poles and replacing associated wiring, removing and replacing PCC driveway aprons, modernization of existing traffic signals at the Roosevelt Road (Illinois Route 38)/Finley Road intersection, construction of new traffic signals at the Roosevelt Road (Illinois Route 38)/Mariano’s Main Entrance intersection, traffic signal electrical service, interconnecting traffic signals, traffic control and protection, erosion control, removal and replacement of pavement markings and reflective pavement markers, removal, storage, and erection of existing signage and new signage, landscape restoration, and all appurtenant items necessary for the completion of the work.

Project Schedule: This project is anticipated to begin in April 2017 and reach substantial completion in September 2017 contingent on Illinois Department of Transportation approvals.

Project Limits: This project is located on Roosevelt Road from 1,000 ft. west of Finley Road to 1,200 ft. east of Finley Road and on Finley Road from 800 ft. south of Roosevelt Road to 1,000 ft. north of Roosevelt Road. 
 
Traffic Impact: No detours are anticipated on this project, however, the project will impact traffic with lane closures. Motorists are reminded to follow traffic signage and exercise caution within the work zone.

FAQs


How does this benefit me?  This improvement project will provide increased roadway and intersection capacity and traffic signal modernization for Roosevelt Road and Finley Road. Dual left turn lanes on Finley Road will alleviate current and projected traffic volumes at the intersection, and a third lane on eastbound Roosevelt Road will accommodate additional traffic for the new Mariano’s grocery store. A new traffic signal will provide convenient access from both directions of Roosevelt Road into the Mariano’s property.

Will my road be closed?  Roosevelt Road and Finley Road will experience lane closures when needed.

If my driveway is inaccessible where do I park?  Driveways will remain accessible for the project duration excluding short-term work periods.

Will my water or sewer service be affected?  Water and sewer services are not anticipated to be affected.